Ressources - Page 2

Digital Eventsseptembre 9, 2020
Revizto 5.0 in the Field
Date: September 15, 2020 at 1:00PM ETDuration:  1 hour In this session we will take a look at Revizto 5.0 on a tablet. Focusing on the power of Revizto 5 features on site. Agenda:• Kiosk...
READ MORE
Digital Eventsseptembre 9, 2020
Revizto for Highways Infrastructure projects
Date: September 17, 2020 at 1:00PM ETDuration:  45 minutes This webinar will look at how Revizto can be used to manage Civil Engineering and Infrastructure design projects. Chris Andrew from AECOM will showcase how Revizto...
READ MORE
Digital Eventsseptembre 9, 2020
Revizto IPAD Tips
Date: September 9, 2020 at 11:00AM ETDuration: 45 minutes In this session we will show you how to easily use Revizto on your IPAD in the field. Agenda:• Optimize your settings for best Revizto IPAD...
READ MORE
Digital Eventsseptembre 2, 2020
Travel and Power in Revizto
Date: September 8, 2020 at 11:00AM GMT+1 Duration:  1 hour Revizto’s Rhys Lewis will chair this session “Travel and Power in Revizto”, with presentations from RHDHV’s Casey Rutland, Toby Wilcox, and Prague Airport’s Daniel Smejkal....
READ MORE
Digital Eventsseptembre 2, 2020
Les meilleures pratiques avec Revizto
Date: 10 Septembre, 2020 at 14:00 GMT+2Durée:  1 heure Lors de ce RevUP le “BIM” nous verrons : “Intégration et collaboration digitale” Tristan Lesaffre Revizto accompagné de Quentin Bertrand et François Anscutter Vinci et David...
READ MORE
Newsaoût 27, 2020
Revizto 5 Open Beta is released ahead of full version expected Q4, 2020
Today Revizto announced the 5 Open Beta release, the company’s most robust and innovative release to date.  The much anticipated 5 release contains multiple industry-first features including object-based navigation, « Google-like » data search abilities within the...
READ MORE
Newsaoût 26, 2020
Check out some of the main Revizto 5 feature overview
READ MORE
Case Studiesavril 30, 2020
How Shared VR has been used to help reconstruct a water treatment center – with potential savings of up to £300,000
Wessex Water has been working on the reconstruction of Durleigh Water Centre. The £50m project is it’s first to be delivered to BIM Level 2 – and the use of an Igloo Shared VR cylinder...
READ MORE
Case Studiesnovembre 19, 2019
An inside look at Mortenson-McCarthy’s $1.9B Raiders stadium construction in Las Vegas
The $1.9 billion Allegiant Stadium in Las Vegas will showcase some of the most high-impact, fan-centered amenities ever found in an NFL stadium. The soon-to-be home of Raiders football will sport a sleek black glass...
READ MORE
Point cloud with overlay
Case Studiesoctobre 27, 2019
Durleigh Water Treatment Works – Igloo aids coordination for Aecom
Client: Wessex Water Lead Contractor: Wessex Engineering and Construction Services BIM Tools: Revizto, Igloo Shared VR cylinder, Revit, Plant 3D A major upgrade to the treatment works, located near Bridgewater in Somerset, will triple capacity...
READ MORE
Case Studiesmai 16, 2019
Integrating Field Teams with VDC Efforts using Revizto
Hill & Wilkinson is a $400m General Contractor in the Dallas-Fort Worth Metropolitan Area. The firm has broad diversity in the markets they serve and dedicated divisions that tailor their services for specific project types....
READ MORE
McCarthy_main
Case Studiesmai 6, 2019
Data Sharing Enables McCarthy To Deliver St. Louis Aquarium Design
General Contractor McCarthy Building Cos. turned to new technology tools to help with the delivery of the St. Louis Aquarium, a $45-million, 120,000-sq-ft, two-story facility located inside St. Louis Union Station. Originally built in 1894,...
READ MORE