
Transforming
Project Collaboration From Any Device
2D & 3D BIM Collaboration Platform
The Ultimate Tool to Centralize Communication & Coordination
Central Hub for All Models
View the entire project by federating all intelligent BIM data including reality capture into a centralized user-friendly location and get all teams in-sync.
Real-time Issue Tracker
Easily standardize the way data moves through the project and effectively communicate model-based tasks with the team.
2D/3D Model Synergy
Leverage a unique 2D/3D combined view, easily compare 2D sheets and work with live CDE documentation seamlessly from inside Revizto.
VR Immersive Experience
Explore real-model data and coordination issues by leveraging Revizto’s immersive, true-to-scale VR experience within seconds!
Clash free projects
Use an integrated solution that combines clash detection, grouping, workflow builder and issue tracking into a single environment.
Collaboration from Anywhere
Contribute from the office or on-site. Keep all trades on task and monitor their progress in the field and access all the project data on a mobile device.
Testimonials
Hear from Our Champions
Architects

Ryan Nowosielski
It has been a life-saver from a project manager's perspective, running a large team for a complicated project. Time saved opening files for daily meetings, and quick one-off coordination questions are the most definite quantifiable returns on investment.

Pedro Fajardo
Revizto has reduced the amount of time spent coordinating models and moved us away from 2D documentation, allowing us to use the 3D models as deliverables.

Michael Paciero
We have fewer coordination issues, are collaborating more between architect and contractor, and leveraging the model for client review more than ever before. Revizto is a highly effective collaboration platform across all disciplines and stakeholders from the owner to the contractor to the designer.

Volker Husel
Revizto has changed how our Project Leaders and Designers look at a project. We update the progress daily and entire team have a good sense of the project's status. It's satisfying to see the tag "Solved" or "Closed" and be able to see that from over 1000 issues, big and small; you resolved 95% of them.
Construction

Kirsten Crock
We have more rapid and thorough communication across our teams. The efficiency of categorizing/filtering and assigning issues to members is an extreme time-saver for us. Revizto gave us more accountability with records of responses and decisions, and accessible history of clash resolution and design issue decisions.

Aaron Bortz
Getting the right information in the right hands at the right time has always been my biggest challenge. Revizto has been an amazing platform to build a bridge between our design and build teams and organize all of our daily, digital-information tasks in an efficient, quantifiable manner.

Federico Pensa
The ROI from using 3D collaboration instead of PDFs and emails is uncomparable. The closest example to this when we shifted from paper to digital. It's just so much better for collaboration, communication, coordination and comprehension!

Robyn Holtgrewe
The whole project team can be in-the-know at all times. We don't wait for trucks anymore or make special drives to get documents to the field; it is a one-stop-shop for all project information. No more trying to figure out which site or software houses the most current drawings or submittals - they're all in Revizto.

Jack Moran
With Revizto, issues identified in pre-con are not lost in construction, and decisions are recorded in context with associated dialogue. It gives us better visualization, leveraging both 2D and 3D data and meaningful collaboration between all stakeholders. There are significant cost benefits.

Jonathan Marsh
I would point to a drastic reduction in the total number and length of coordination meetings, and the elimination of almost all onsite coordination meetings. I estimate time-savings around 80 hours for two weeks, per coordinator, for a near 3 million dollar mechanical job.

Paulina Acosta
We have reduced man-hours of VDC personnel from training on the platform, maintaining viewpoints, updating drawings, and not having to be present in every coordination meeting. The content is available for project teams to consume and do their issue tracking without much help from VDC.
Subcontractors

Jonathan Marsh
I would point to a drastic reduction in the total number and length of coordination meetings, and the elimination of almost all onsite coordination meetings. I estimate time-savings around 80 hours for two weeks, per coordinator, for a near 3 million dollar mechanical job.

Daniel Reuter
With Revizto, errors and constructability issues are identified before fabrication and as a result, minimizes re-work in the field. We can capture that would have previously been lost.









News and Media
