Revizto White Paper

The Integrated Project Delivery Advantage

A Blueprint for Faster Builds, Fewer RFIs, and Stronger ROI
Tired of cost blowouts and disputes? This white paper shows how digitally-enabled Integrated Project Delivery (IPD 2.0) cuts RFIs by 80%, reduces delays, and boosts ROI. Backed by insights from 60+ AECO leaders and a proven case study, it gives you clear steps to deliver faster, on budget, and with fewer disputes.
Practical Strategies for Success
Practical Strategies for Success

Packed with recommendations from 60+ AECO leaders, this white paper tackles the barriers to adopting IPD 2.0 with clear, actionable strategies for procurement, contracts, leadership, team culture, and collaboration – giving teams practical steps to build faster, cut RFIs, and maximize ROI.

Integrated Project Delivery presents a real opportunity for New Zealand to rethink how we deliver complex projects. By aligning teams early and managing risk collectively, we can unlock better outcomes – not just in time, cost, and quality, but in how we shape enduring value through collaboration.

Andre Koolen
Director, RCP
Real-World Proof in Action
Real-World Proof in Action

See how New Zealand’s $90M Lincoln University Waimarie science hub applied IPD 2.0 to cut coordination conflicts by over 80%, eliminate hundreds of RFIs, and deliver the award-winning facility ahead of schedule and on budget.

IPD enabled us to re-scope our design role into the contractor’s world – fewer hours on site, but far more impact upfront – reducing coordination conflicts by over 80% before construction even started.

Brad Sara
Principal, Warren and Mahoney
Revizto White Paper
The Integrated Project Delivery Advantage
A Blueprint for Faster Builds, Fewer RFIs, and Stronger ROI
Tired of cost blowouts and disputes? This white paper shows how digitally-enabled Integrated Project Delivery (IPD 2.0) cuts RFIs by 80%, reduces delays, and boosts ROI. Backed by insights from 60+ AECO leaders and a proven case study, it gives you clear steps to deliver faster, on budget, and with fewer disputes.
Download Now
The Integrated Project Delivery Advantage 2025-10-14T11:56:37+00:00
Revizto
World Trade Center Lausanne Avenue de Gratta-Paille 2 1018 Lausanne, Switzerland
1018 CH Lausanne
+41 21 588 0125 logo
logo
image