事例紹介

Case Studies11月 13, 2023
Behind the Scenes: MP Lundy’s Game-Changer
How a Mid-Market GC is Driving Efficiency, Accountability, and Enhanced Client Relations in Modern Construction with Revizto. Based in Ottawa, M.P. Lundy Construction specializes in complex commercial construction projects and has emerged as a leader in the local Construction Management sector.
READ MORE
Case Studies10月 18, 2023
Project Potomac: An Inside Look Into KPF’s Collaborative Design Workflow
In this case study, KPF, a unified architectural practice, shares how Revizto integrally streamlined their collaboration process throughout Project Potomac
READ MORE
Case Studies9月 11, 2023
Revizto x Mortenson: Effective Coordination on Large Projects
Large construction projects require dependable software for effective coordination. In a joint webinar with Revizto, Mariya Sorensen, Senior Integrated Construction Manager at Mortenson, shared why her team made the decision to switch to Revizto halfway through the UW Health Eastpark Medical Center project’s coordination process, and how they were able to accomplish this transition successfully
READ MORE
Case Studies8月 3, 2023
Fast-tracking Transit Project in Fast-growing Seattle Area
When working on a project of this scale, coordinating a wide variety of services and designs into the build site is no easy task. To help overcome this obstacle, our team used an inventive combination of modeling and design review tools—such as Revit, Civil 3D, Navisworks, iConstruct, and Revizto—in a BIM process in unique and nontraditional ways.
READ MORE
Case Studies7月 25, 2023
Streamlining Design Workflows at the Pittsburgh Airport
In this case study, Scott Deisher, an associate, registered architect, and design researcher at Abstract Group, shares how Revizto became the foundation for building a centralized, streamlined, and collaborative workflow throughout the design phase of the airport’s renovation project.
READ MORE
Case Studies7月 4, 2023
How Integrated Project Delivery (IPD) Embraces Digital Ways of Working to Support Project Execution
Jacobs is a globally recognized pro...
READ MORE
Case Studies5月 18, 2023
Building Future: Kier’s Fitzalan High School Project Powered by Revizto
In our newest case study, we spotlight the pivotal role Revizto played in Kier’s Fitzalan High School project. As a world-class construction and infrastructure services company, Kier sought to bolster project efficiency and communication; Revizto was their tool of choice.
READ MORE
Case Studies5月 17, 2023
How Prague Airport Soared to New Heights with Revizto
We’re excited to share one of our most recent success stories, highlighting how Prague Airport, one of the busiest transport hubs in Central Europe, implemented Revizto to streamline its operations and minimize operational disruptions.
READ MORE
Case Studies2月 7, 2023
Bringing better visibility and clarity to all team members
Ian Massey, the Regional BIM Manage...
READ MORE
Case Studies11月 9, 2022
Eagle Point Develops Content for Revizto for McCarthy
Eagle Point Software developed e-le...
READ MORE
Case Studies10月 25, 2022
A New Level of Collaboration
Matter, a Melbourne-based structural engineering consultancy with recently opened offices in Adelaide, utilizes Revizto throughout all their projects.
READ MORE
Case Studies10月 24, 2022
Distributing tasks is faster and clearer
IBF utilized Revizto throughout multiple projects for improved collaboration and delivery.
READ MORE