Glossary January 20, 2025
Updated 20 January 2025 by James Ocean
Share this:

Understanding BIM Documentation for Construction Design Success

Table of Contents

Building information modeling has completely changed the architecture, engineering, and construction industry by offering a fundamentally different approach to project planning, design, and execution. As construction projects have grown in complexity and scale with time, there is a lot more pressure now for the creation of detailed and helpful documentation within BIM environments.

The digital transformation of the construction industry requires a deep understanding of various BIM documentation practices that are beneficial to both seasonal veterans in the field and newcomers. Proper BIM documentation enables impressive project efficiency, enhanced compliance capabilities, and seamless collaboration between stakeholders.

What is BIM documentation?

BIM documentation is a collection of digital information and models with extensive detail on every single aspect of a construction project throughout its entire lifecycle. BIM documentation is data-rich, dynamic, and can integrate multiple dimensions of project information into one centralized environment, which makes it completely different from traditional construction documentation.

Definition and importance of BIM documentation

BIM documentation includes all digital files, models, and associated information that describes the functional or physical characteristics of a building. This includes material properties, schedules, technical specifications, cost data, 3D models, maintenance requirements, and much more.

BIM documentation is important thanks to several key factors:

  • It enables improved decision-making via better analysis and visualization.
  • It is a single source of truth that has all project information integrated into it.
  • It offers enhanced lifecycle management capabilities for building assets.
  • It improves coordination between disciplines, resulting in fewer errors.
  • It ensures straightforward and convenient communication between stakeholders.

Key features of BIM documentation

BIM documentation can be distinguished by a collection of key features that set it apart from traditional approaches to documentation:

  1. Each element can contain metadata about its properties, costs, materials, and relationships with other components, which is absent from traditional methods.
  2. Digitalized documentation in BIM helps maintain a detailed history of changes, allowing for modification tracking, version control, and a number of other advantages.
  3. All objects in BIM documentation are relationship-aware and intelligent thanks to the parametric modeling, which makes them capable of automatically updating themselves across all views when one of them is modified in some way.
  4. BIM documentation can even go above and beyond the capabilities of 3D modeling with:
    1. 4D (construction sequencing and scheduling)
    2. 5D (budget and financial planning)
    3. 6D (environmental impact and energy analysis)
    4. 7D (operation and maintenance information), and so on.

How BIM documentation enhances construction projects

BIM documentation transforms construction projects across multiple areas that are connected to one another.

In the planning and design phase, this approach makes it easier to locate clashes or conflicts before they can become on-site problems with very high costs of resolution. The ability to visualize project outcomes with outstanding accuracy leads to more informed decision-making and better cost estimations while also improving the efficiency of design analysis processes.

Collaboration is one of the most important segments of BIM as a methodology, and it is strongly reflected in the way BIM documentation is formulated. The ability to share information in real-time creates a better collaboration atmosphere, with different disciplines working with each other using a single source of truth as the mediator. Improved communication also reduces the amount of potential rework and leads to much more efficient projects for all parties involved.

In the construction phase of project realization, BIM documentation offers a large number of capabilities to optimize processes. Better precision for construction sequences directly affects the efficiency of resource allocation, allows for optimal material use, reduces waste, and so on. Even on-site safety is positively affected by BIM documentation, as potential safety hazards can be identified and addressed as early as the design phase.

The implementation of BIM documentation can even affect workflows and processes after the construction phase is complete, in the facility management and maintenance phase.. Comprehensive documentation with deep insights into different aspects of the building can greatly expand the range of capabilities for facility managers, which translates into better maintenance planning, improved building resource utilization, and more.

These enhancements are some of the most upfront examples of how BIM documentation fundamentally improves the delivery and maintenance of construction projects. In a way, the influence of BIM documentation can be visualized as a digital thread of sorts which connects every phase of the project with the others, making it easier to exchange information, perform analysis, and come up with actionable recommendations.

How can effective BIM documentation be created?

Like BIM in general, none of the advantages of BIM documentation can be gained simply because a company has implemented a solution that supports it. The creation of effective BIM documentation necessitates a systematic approach with careful planning and execution in order to make sure that the documentation can serve its purpose at different stages of the project lifecycle.

Step-by-step guide to the creation of BIM documentation

The process of creating BIM documentation can be separated into three large segments.

Step 1: Establishing requirements. The very first action that must be taken is the identification of the level of detail (LoD) that will be used for different model elements. The choice of LoD directly influences all subsequent decisions in documentation, determining what kind of information will be attached to each object and the actual level of detail of the 3D models.

Step 2: Environment setup. Project environment setup is the next major milestone in the process. This is where the template files are created, the naming conventions are established, and the workflows are defined. It is also important to establish shared parameters and project coordinates early on to reap the benefits of consistent documentation standards.

Step 3: Implementation. As soon as the proverbial foundation is complete, project teams can begin the modeling and documentation processes. Most BIM models start with basic building geometry, which is improved and expanded as time goes on. It is important to model each element with consideration for how it will be used throughout the project lifecycle from start to finish.

Common software tools for BIM documentation

The BIM documentation software landscape is full of solutions and tools that have their own use cases, advantages, and shortcomings. Here are several examples of such solutions:

  • Autodesk Revit is the de-facto industry standard for building modeling and documentation. It is one of the most popular BIM solutions on the market.
  • Navisworks is a solution that facilitates clash detection and project review capabilities in a seamless manner.
  • Autodesk Construction Cloud is a flexible collaborative platform that has expanded from a dedicated solution called BIM 360, providing vast cloud-based collaboration capabilities.
  • Solibri Model Checker is a much more specialized option that is used primarily to validate models against project requirements and industry standards.
  • ProjectWise is a data management platform. It makes sure that data remains both secure and accessible throughout the entire lifecycle of a project.

Best practices for using third-party software such as Revizto in BIM documentation

Revizto is another example of a tool that deals with BIM documentation in a certain way. Revizto’s primary goal is to assist companies with visualization and issue tracking, although it also has a variety of other features to work with.

Even when implementing a solution as flexible as Revizto in a BIM workflow, it is always a great idea to start by establishing clear issue creation and issue management protocols beforehand. For the software to be useful to the company, all team members must be able to freely track resolution progress, assign responsibilities, and categorize issues.

Integration with other BIM platforms is an important cornerstone of Revizto’s effectiveness. It is highly recommended to establish clear workflows for model synchronization, with regular update schedules and specific model handling processes.

When Revizto is used alongside other BIM tools, make sure that there is a single well-defined hierarchy for documentation maintenance that applies to the entire platform to drastically simplify document management processes. There are also several collaborative features that can be leveraged for improved communication around documentation, such as annotation and markup tools that provide context-specific feedback for models.

The careful implementation of all these tools and practices can help teams create comprehensive BIM documentation, which is a valuable asset throughout the entire project lifecycle. Consistency, accessibility, and clear processes to follow are the primary goals of BIM documentation.

What are the standards for BIM documentation?

Industry standards for BIM documentation are used as a framework to ensure the quality, consistency, and interoperability of information across projects. The goal of these standards is to guide professionals on how to create documentation that is consistent with both industry best practices and the technical requirements of the company.

Overview of industry standards for BIM

When it comes to the BIM documentation landscape, there are a few well-known examples of regional and international standards. ISO 19650 is our first example. It is an international standard that acts as a cornerstone of BIM documentation standards, with comprehensive guidelines on how to manage construction information in BIM. This standard is the closest to our original definition of an industry standard for BIM documentation: it is a framework for information management during both project delivery and the operational phase of the project.

Another, somewhat less comprehensive, example of a BIM documentation standard is PAS 1192.  It is a collection of fundamental principles that can influence many BIM documentation practices (it should be noted that many of the requirements of PAS 1192 are superseded by ISO 19650).

As mentioned above, there are also multiple examples of regional standards for BIM documentation, as well. For example, the National BIM Standard (referred to as NBIMS-US) is a collection of detailed guidelines that are custom-fit for the American industry specifically. We should also mention here that most European countries do not have such standards and choose to follow the EN ISO 19650 rule sets instead.

In addition to these standards, there are also many organizations that have created their own standards and guidelines. For example, there is the UK BIM Framework, which is one of the few BIM regulations in the European region, offering detailed guidance on the implementation of ISO 19650 and practical resources for BIM documentation.

Alternatively, there are also level of development specifications, which define the specific degree of development of the model elements in each stage of project realization.

How to ensure compliance with BIM standards

Compliance with BIM standards can be achieved using a strategic approach to documentation management. The first step in this effort is always to create a detailed BIM execution plan (BEP) that is aligned with the relevant standards and regulations. A competent BEP should outline a number of factors:

  • Roles and responsibilities.
  • Quality control procedures.
  • Information delivery strategy.
  • Technical specifications and requirements.
  • Project milestones and deliverables.

Maintaining compliance, in the long run, is something that cannot be done properly without regular audits and systematic reviews against established standards. Many of these verification and review processes can be automated to a certain degree, such as with the software we have mentioned above.

Additionally, a company should never cheap out on training and education when aiming to ensure compliance with BIM documentation. All team members should have a clear understanding of the standards and requirements that the organization follows, and they should receive practical guidance on implementation. Every training initiative should be documented accordingly, and the same kind of logic should be applied to any and all competency assessments.

Documenting standards: checklist for success

A comprehensive checklist can help teams with maintaining consistency in applying BIM standards throughout the entire project infrastructure. The most noteworthy elements of such a checklist are:

  • Information management
    • Verify the implementation of a common data environment
    • Ensure the consistency of file naming conventions
    • Track document versions and revisions
    • Maintain structured metadata for all documentation
  • Technical requirements
    • Verify compliance with chosen LOD requirements
    • Ensure the correct implementation of the coordinate system
    • Check the precision and accuracy of the geometry
    • Monitor the proper use of classification tools
  • Quality assurance
    • Verify proper element classification
    • Monitor regular clash detection procedures
    • Maintain consistency in properties and parameters
    • Analyze the accuracy and completeness of information
  • Collaboration protocols
    • Verification of communication protocols
    • Monitoring of change management process
    • Documentation of information exchange procedures
    • Storage of detailed records for permissions and access rights

Adherence to these standards, along with the implementation of robust compliance measures, ensures that BIM documentation meets specific industry requirements without negatively affecting the productivity of project delivery processes. The primary goal here is to find a balance between practical usability and rigorous compliance standards.

Regular updates and reviews for compliance procedures assist teams when it comes to keeping up with industry best practices and ever-evolving standards. This proactive approach ensures that BIM documentation continues to serve as an effective solution for asset management and project delivery.

How can BIM documentation be analyzed for efficiency?

Efficiency is crucial in BIM documentation analysis. It is necessary so that project outcomes can be optimized and to ensure that the documentation serves its intended purpose. Detailed analysis helps teams with workflow improvements, the identification of bottlenecks, and even the improvement of the overall quality of project documentation.

Key factors to consider in BIM document analysis

Several important factors should be kept in mind when evaluating BIM documentation. First, the information structure is the foundation of efficient documentation, including relationships between model elements, clarity of information hierarchies, and general data organization rules. The information structure should be able to facilitate efficient workflows and support easy access to needed information at the same time.

The second aspect is model performance, a detailed assessment of document loading times, hardware requirements for efficient operation, file sizes, model responsiveness, and impact on collaborative workflows. The overall performance of a BIM model directly affects the majority of other elements in the BIM environment, which means that it is extremely important.

Metadata quality is another valuable aspect of BIM documentation that must be analyzed thoroughly. At this step, the goal is to evaluate custom data fields, the implementation of classification systems, element properties, and the detailed documentation of revisions or changes in the environment.

Tools for evaluating efficiency of BIM documentation

As with the previous topic, some analysis operations can be assisted with dedicated software. Our goal is to present a variety of different options to showcase how vast and varied the BIM software market truly is:

  • Autodesk Model Checker offers comprehensive checks of model health, using predefined standards and rules as the point of comparison with real-life data.
  • BIM Track provides advanced issue-tracking capabilities to help identify patterns of issues in documentation.
  • Power BI is one of the most popular business intelligence tools. It creates detailed analytics dashboards that visualize common issues, documentation use patterns, resource utilization statistics, team performance metrics, and so on.
  • Naviate provides specific performance analysis capabilities that can assess workflow efficiency, analyze collaboration patterns, track documentation updates, monitor model performance metrics, etc.

There are many other options to choose from when it comes to BIM software for documentation analysis or other purposes. Our goal here was to show how many options there are for both highly specialized tasks and common use situations.

How to identify areas for improvement in BIM documentation

The identification of areas for improvement in BIM documentation necessitates a well-structured approach that uses both human expertise and automated analysis. There are many different areas that can be analyzed to find areas for improvement, including:

  • Baseline assessment – this includes resource utilization patterns, model performance records, time spent searching for necessary information, and the average frequency of documentation-related issues.
  • User feedback – this entails the tracking of documentation use, performance review meetings, issue reporting systems, regular team surveys, etc.
  • Trend and pattern identification – this involves inefficient file organization, inconsistencies in naming conventions, redundant or outdated information, and incomplete or accurate metadata.
  • Performance bottlenecks – network performance analysis, monitoring the use of system resources, the evaluation of storage requirements, tracking patterns of file access, etc.

All these analyses should provide at least some examples of actionable improvements that could be made to current documentation practices. Once the analysis phase is complete, it is recommended to create a list of potential enhancement opportunities, prioritized with several factors in mind: impact on project efficiency, expected ROI, resource requirements, and the capacity of the team for change.

Careful analysis and systematic improvements can be gateways for teams to enhance their efficiency when handling BIM documentation, resulting in more effective resource utilization and better project outcomes. These analysis procedures should also be reviewed and refined on a regular basis, making sure that the documentation framework continues to evolve to meet newer project needs without incurring performance losses.

What role does BIM documentation play in project management?

BIM documentation is a cornerstone of modern project management that can fundamentally transform the way construction projects are planned, executed, and delivered (when implemented correctly). The integration of BIM documentation with project management workflows creates a dynamic environment that can enhance decision-making and project control.

Integrating BIM documentation into project management strategies

The integration of BIM documentation with project management necessitates a well-structured approach to align documentation capabilities and project objectives. It is up to project managers to understand how BIM documentation can support key management processes, with the most notable examples being:

  • Schedule management

BIM models linked to project schedules can create what are called “4D simulations.” They allow teams to visualize construction sequences, optimize resource allocation, and identify potential scheduling conflicts. The ability to track progress against planned timelines is another substantial benefit worth mentioning here.

  • Cost control

Deep integration with cost management systems makes it possible for project managers to monitor budget performance, generate accurate quantity takeoffs, forecast total project costs with better accuracy, and track the cost implications of any design changes.

BIM documentation can offer significant assistance with identifying and managing project risks. The most notable improvements here are in constructability analysis, quality control documentation, clash detection/resolution, as well as safety planning and visualization.

How BIM documentation facilitates better communication

Effective communication is an important factor in any project management environment. It should not be very surprising to see how the introduction of BIM documentation can drastically improve the results of these efforts.

For example, the common data environment practice that BIM promotes can serve as a central hub for stakeholders to use for tracking decision-making processes, accessing current project information, maintaining clear communication records, and sharing updates or concerns.

Visual communication, as an aspect of BIM documentation, can assist with the early identification of issues, the presentation of progress to stakeholders, the effective communication of solutions to issues, and the ability to explain and understand complex design intentions to any stakeholder or client.

As mentioned above, the ability to collaborate in real-time is an exceptional advantage on its own. It enhances stakeholder engagement, results in the quick resolution of design queries, and leads to more efficient coordination between disciplines. Additionally, the ability to share project updates with little to no delay dramatically reduces the risk of miscommunication or the use of outdated information in the project.

Managing changes and updates in BIM documentation

Change management in BIM documentation is a combination of project control capabilities and technological advancements. Traditional change management can be transformed into a dynamic, proactive process that can anticipate project evolution and respond to it with the help of BIM capabilities.

In this case, change tracking can become an intuitive process with completely unique data trails for every modification. Modern environments can capture both the changes themselves and the project context around them, explaining how these changes are made and why. The ability to trace the evolution of design decisions and understand how each change affects the rest of the environment is a massive advantage to the efficiency of any construction project.

On the other hand, we also have the impact assessment capability, which is a move from a reactive to a predictive approach. As soon as there is any change in the environment, integrated BIM documentation makes it possible to visualize potential conflicts before they happen and to understand their cost implications in different scenarios. Aside from that, it should also be possible to evaluate the scheduling impact and assess the amount of resources required to mitigate issues in real time.

Version control capabilities are also changed under the influence of BIM workflows. What once was a simple file management environment now becomes a comprehensive information governance workflow with an abundance of capabilities. Modern BIM platforms can assist with creating an environment where design evolution is a valuable resource, historical design decisions are both contextualized and accessible, and teams naturally gravitate toward the most up-to-date information.

At the same time, all these improvements tend to change many existing processes, and navigating the newly updated environments can be difficult without preparation. In this context, it is up to project managers to develop carefully crafted protocols and streamlined processes to document change requests, implement changes, maintain clear communication channels, and facilitate efficient protocols for review and approval processes.

This sophisticated approach to change management makes BIM documentation much more than a record-keeping environment: it is a dynamic tool that helps manage and leverage change for the sake of overall project success. The proactive stance on change management ensures that projects stay agile without losing control over the environment, making sure that each modification improves project processes instead of disrupting them.

How is BIM documentation kept up-to-date?

Maintaining current BIM documentation is a process that requires a proactive approach in most cases. A balance between efficiency, accessibility, and accuracy is necessary to ensure that the documentation remains in touch with real-world conditions in order to prevent the disruption of project realization processes.

Strategies for regular updates of BIM documentation

Robust update protocols are the cornerstone of successful documentation maintenance in BIM. A structured update schedule that is aligned with project milestones and critical decision points is a good starting point for this process.

Clear update procedures should be developed with the primary goal of defining validation requirements, responsibility assignments, and quality control checkpoints with regular review intervals. Some of these update processes can be automated in the form of regular backup procedures, scheduled model synchronization, system health checks, and automated clash detection.

Collaborative updates assist with boosting team-wide engagement via defined handover procedures and clear communication channels. They also help coordinate update schedules across disciplines and improve concurrent work management efforts.

Using data management for BIM updates

Effective data management is necessary for successful documentation updates. Many modern BIM practices require complex data management strategies that classify information, control data quality, and manage integration in a single package.

Here is what is usually expected from a modern BIM environment:

  • Information classification involves established data hierarchies, update frequency prioritization, maintenance of metadata standards, and data optimization by discipline.
  • Data quality control includes the verification of the accuracy of information, the monitoring of data completeness, the implementation of validation procedures, and the verification of data consistency.
  • Integration management focuses on managing data dependencies, coordinating multiple data sources, ensuring data compatibility, and maintaining system connections.

Importance of version control in BIM documentation

Version control is an aspect that must be looked into with more detail. It is a critical component when it comes to maintaining overall documentation integrity. A competent version control strategy supports collaboration, maintains accessibility, and tracks model evolution at the same time.

Collaboration is supported using version comparison tools, change notification systems, concurrent version management, and a variety of conflict resolution procedures. On the other hand, accessibility is maintained via access permission management, the archival of obsolete data, the creation of a clear version hierarchy, and the establishment of a centralized naming convention.

Model evolution tracking can usually be achieved with a combination of impact assessment, progress monitoring, decision documentation, and detailed change logs.

The overall success of documentation maintenance efforts relies on the establishment of regular review procedures, effective communication channels, robust backup environments, and clear responsibility assignments. This systematic approach helps ensure that BIM documentation reinforces its place as a valuable and reliable project resource.

What are the cost implications of BIM documentation?

Both the implementation and maintenance of BIM documentation are substantial investments that might impact the overall financials of a project throughout its lifecycle. Organizations can make much more informed decisions about BIM implementation and resource allocation when they understand all the potential cost implications it brings.

The initial investment in BIM documentation covers a number of important issues. Hardware and software requirements are a good example – powerful workstations, servers, and software licenses tend to be expensive for business clients. The cost of staff training and the potential reduction in productivity during the learning period should also be considered in this section.

Fortunately, the long-term financial benefits of BIM outweigh any of the upfront costs BIM might require. Early clash detection through BIM documentation alone can save a substantial amount of resources in reduced costs for construction rework, improved coordination, and optimized resource allocation.

There are also some costs that become more manageable as time goes on, such as training costs. While they do require substantial initial investment, the process of maintaining general team competency is much less expensive in comparison, especially if the company develops internal training resources and best practices over time.

The maintenance costs for BIM documentation include hardware upgrades, ongoing technical support, and software updates. Cloud-based software also requires subscription fees, but the total cost of local infrastructure is lower in these examples, striking a balance of sorts. The cost of data storage and backup systems should also be considered here, since all companies must maintain documentation in an accessible but secure state.

The return on investment manifests in many ways when it comes to BIM documentation:

  • Expensive on-site conflicts occur less often due to improved project coordination.
  • Better client communication and fewer changes during construction are guaranteed by enhanced visualization capabilities.
  • Accurate quantity takeoffs and cost estimations provide improvements to budget control and resource planning.
  • Even operational costs are reduced to a certain degree throughout the building’s lifecycle due to the existence of comprehensive as-built documentation.

Conclusion

BIM documentation is a modern transformative force in the architecture, engineering, and construction industries that has the potential to fundamentally change the way projects are created and executed. In this comprehensive exploration of the topic, we have gone over the process of creating BIM documentation and the abundance of advantages it can provide if implemented correctly.

The integration of sophisticated tools and platforms enables teams to create and maintain comprehensive digital twins of their projects, with plenty of great examples of software that are not massive overarching platforms (Revit) but rather case-specific and specialized solutions that are focused on resolving a specific group of issues (Revizto).

The financial implications of introducing BIM documentation are relatively simple – the substantial initial investments are clearly outweighed by the massive number of long-term benefits, such as enhanced operational efficiency, improved coordination, reduced errors, etc. As technology continues to evolve, the value proposition of BIM documentation will improve even further, as well.

The successful implementation of BIM documentation environments relies on commitment, expertise, and a continuous process of adaptation to newer technologies and methodologies. The investment of time and resources is worthwhile for almost any organization in the industry, making BIM documentation a very promising avenue for developing company infrastructure.

Frequently asked questions

What kind of certifications or training programs are recommended for specialists in BIM documentation?

There are a number of recognized certifications to enhance expertise in BIM documentation.

  • buildingSMART Professional Certification offers comprehensive training in the principles and practices of openBIM.
  • Autodesk’s Professional Certification in Revit or ACC is highly valued by many employers.
  • BIM Forum and similar organizations offer dedicated training programs that focus on specific aspects of BIM documentation and management.

What are the legal implications of BIM documentation in the context of contract disputes?

BIM documentation is increasingly recognized as admissible evidence in construction disputes. The ability to track changes and decisions creates a detailed audit trail that is crucial for resolving conflicts. At the same time, organizations must establish clear contractual language regarding the ownership of BIM documentation, liability, and intellectual property rights in order for the documentation to have any chance of being considered evidence in legal frameworks.

Are there any strategies for implementing BIM documentation for small companies with limited budgets?

It should be possible to implement BIM documentation in smaller environments using a phased approach. It is possible to start with basic modeling support while gradually adding capabilities over time. Cloud-based infrastructure might also be a good choice due to its lower upfront cost compared with on-premises deployments. Some BIM solutions also offer pay-per-use options to limit total costs, as well.


About the author
James Ocean

BIM/VDC Specialist. James Ocean is Head of BIMspiration at Revizto and keeps everything moving onwards and upwards. From supporting and teaching our internal team as well as our clients, James shows us the ins-and-outs and how to best leverage Revizto to maximize workflows, cut costs, and get all types of projects through the finish line.

Share this:
Understanding BIM Documentation for Construction Design Success Our goal in this article is to offer a somewhat structured approach to understanding and implementing effective BIM documentation strategies in a modern construction landscape. 2025-01-20T18:59:42+00:00
Revizto
World Trade Center Lausanne Avenue de Gratta-Paille 2 1018 Lausanne, Switzerland
+41 21 588 0125
logo
image