What is Construction Project Management?
- The basics of construction project management
- A brief look into the history of construction management
- Objectives of construction management
- General types of construction project management
- Industrial construction management
- Construction management and a project manager’s role in it
- Construction management and a contractor’s role in it
- The basics of construction project management – winning a project.
- Obstacles for construction management as a process
- Construction projects and their business models
- The process of project management and the main principles
- Different stages of a construction project
- Scheduling and organizing a construction project
- Issues, problems and other legal matters in the context of a construction project
- Environmental/neighborhood impacts of a construction process
- Construction project management as a job
- Education in the field of construction project management
- Sustainability in the construction industry
The basics of construction project management
The most basic level of construction project management controls three main stages of a construction project: planning, coordination, and execution. Construction project management is a sophisticated profession that requires a substantial amount of knowledge in many different areas, including law, business, finance, mediation, and such.
The necessity to have that much knowledge is driven by the nature of construction project management as a job that often includes complicated tasks from many different fields, depending on the current project stage and many other reasons. To handle all of that, a construction project manager needs to have a defined communication skills, extensive problem-solving capabilities and the previously mentioned wide variety of knowledge about different parts of the building process as a whole.
A more abstract definition of project management as a process is defined by PMI (Project Management Institute). It explains project management as the art of directing resources, both human and material, throughout the lifetime of a project by utilizing various management techniques to achieve the end goal when it comes to costs, time, quality, scope, and all of the participating objectives.
A brief look into the history of construction management
As it stands, project managers have existed anywhere when there was a need in the complex building projects. For a long time, this duty was on the architect’s shoulders, as it is thought to be the case with many ancient structures from Rome, Egypt, and such.
In the age of Renaissance, there’s been more popular and unique designs from specific architects. One of those examples is Sir Christopher Wren of England, who designed a number of buildings in both late 17th and the early 18th centuries, including the well-known St. Paul’s Cathedral in London. The wide variety of skills and knowledge that Wren possessed directly foreshadowed the skill types that would later be required from anyone to handle a complicated construction project, even though in that age it was all about advanced mathematics, physics and design.
Another example of the evolution of construction management can be remembered as a set of rules that has begun to take shape across corporate America around the time of World War II, and after the end of the war those same skills were put into many different civil construction projects. This shows the successful appliance of the basics of construction engineering projects that were applied to a number of corporate projects.
Right now, the digitalization trend is not missing the construction management industry, either, with more and more details being addressed digitally, and more to come in the near future. One of the prime benefits of this digitalization is set to be the ability to track and manage the work process from anywhere, due to the sheer number of mobile-friendly technology and software.
Objectives of construction management
The brunt of setting up and following all of the different rules and regulations of construction management is usually on the construction managers plate, and professional construction managers are using industry-standard practices for the correct project management process.
With that, all of the objectives of construction management can cover six principal fields of construction management: quality, safety, function, scope, schedule and costs. These objectives are presented in the list below:
- Supervise and instruct all of the personnel on-site about the proper procedures and activities;
- React and resolve various problems and emergencies, like work delays;
- Calculate and negotiate budgets, schedules and cost estimates;
- Keep in mind various legal and safety requirements, along with other regulations;
- Create an educated choice on which construction strategies and/or methods to work with;
- Make regular work progress reports and present them to the client;
- Hire and instruct various subcontractors, laborers and so on;
- Work through the terms of the contract and different technical nuances with your employees;
- Initiate collaborations with specialists from other departments, like engineers, architects, and so on.
General types of construction project management
Construction project management can be broken down into several project types, but that can only be achieved by going back to the basics. There are three primary types of construction management – industrial, infrastructure and buildings. Each of those can be either residential or commercial. Next, we’ll go over definitions of different types of construction management:
- Residential construction project management is a term used in the case of investors or landowners having any residential property that they want to renovate. Apartment complexes, single-family houses, and multifamily homes – these are just some examples of a property that would work with residential construction project management.
- On the other hand, commercial construction project management is a different branch dealing primarily with buildings prepared to be used for commercial space. Renting out or selling placements for retail organizations and corporations is the main objective of these buildings. Their renovation programs are aimed to improve various components of your commercial space to make it more attractive to potential clients.
Three construction types listed above can also be split into several subsets, such as:
- Commercial construction projects – malls, manufacturing plants, hospitals, schools, retail stores, sports facilities, and many others.
- Industrial construction projects – a category that is somewhat similar to commercial construction but leans more into heavy-duty manufacturing facilities, power plants, and petroleum-related projects (land rigs, drilling rigs, and so on).
- Residential (and/or renovation) construction projects – creating new apartments or houses, as well as improving (restructuring, rebuilding) the existing ones.
- Roadway construction projects – street paving, highway construction, road renovations, etc.
- Heavy civil construction projects – most non-standard building types, such as flood control facilities, sewage treatment plans, dams, and so on.
With all that in mind, it’s possible to break down the construction project management in ten different markets:
- Manufacturing
- Transportation
- Telecom
- Water
- Power
- Buildings
- Waste/Sewer
- Hazardous waste
- Petroleum
- Industrial
Industrial construction management
Going back over the three main types of construction project management, two of them seem pretty obvious – “infrastructure” and “buildings” are both pretty much self-explanatory and don’t need more explanation. However, another part of this list is slightly different from others, and that is industrial construction management.
Industrial construction, in general, is far away from the daily residential construction style since industrial often means “big”, “massive”, and other synonyms of the word. More often than not, industrial structures are truly titanic in their size and complexity, ranging from power plants and factories to skyscrapers, warehouses, and so on.
Such projects are often referred to as “larger-than-life” projects, implying the excessive amount of longevity that industrial objects are supposed to work for – bridges, oil refineries, dams, etc.
Another distinctive trait of industrial construction management and industrial construction is the tools they’re working with. This implies that some of the projects require much bigger and stronger excavators, trucks, and other construction tools, often produced in limited units due to their complexity and cost.
Obviously enough, the sheer scope and the complexity of such structures means that the construction workers on the project are supposed to have a massive amount of experience and training, true professionals of their craft. On the other hand, industrial companies are also many times longer than their residential counterparts, often having thousands of employees and working across multiple nations in the first place.
Construction management and a project manager’s role in it
The project is always expected to move in accordance to the schedule – and the project manager is the only one responsible for that. Every project should ideally be finished on schedule, within budget and should meet all of the plans, specs and codes of the building. It’s not uncommon for a project manager to also work on somewhat different tasks, such as hiring or vetting subcontractors/workers, creating a conflict resolution strategy, setting finances, calendar and parameters, and so on.
There are several different views on the full list of construction manager’s responsibilities, even though the difference between them is not always significant. An example of that is the Construction Management Association of America (U.S. construction management advocacy and certification body) declares that there are 120 common responsibilities of a construction manager that can be split in seven main categories. These categories are also often referred to as the functions of project management. This list includes:
- Time management (efficient time use, delegation, prioritization, communication with different departments)
- Contract administration (information exchange, final design check)
- Cost management (setting up a budget, determining various costs, etc.)
- Safety management (plans for potential safety hazards, better safety protocols)
- Project management planning (defining tasks and estimating dates)
- Quality management (work practices analysis, material analysis, etc.)
- Construction management (professional practices)
Each of these categories has five stages corresponding to the number of stages in any construction project, such as Pre-design, Design, Procurement, Construction, and Post-construction maintenance.
Construction management and a contractor’s role in it
Any construction project starts with a design phase, and as soon as that’s over – it’s time for the bidding process to different contractors, if they are interested. There’s a number of qualifications that contractors must be able to prove to be considered in the first place, such as the ability to handle:
- Human resources
- Engineering
- Public safety
- Decision-making
- Drafting
- Quality/time/costs management.
The choice between contractors that meet the requirements is made through either the low-bid selection, the qualifications-based selection or the best-value selection.
The basics of construction project management – winning a project.
As soon as the project owner is ready to begin the bidding process, they will share their project’s information with a wide variety of contractors, subcontractors, and so on. The first part of the process lies in cost estimates, when the contractors are evaluating the blueprints and the material requirements to assess the total cost of the owner’s project. There’s two known bid types: open bid and closed bid.
Open bids are usually applied to public projects and often advertised, allowing for any contractor to put in an offer. Closed bids, on the other hand, are when the owner is giving a specific set of contractors invites to said project so that they can respond with their own bids.
After getting all of the bids, the owner’s job is to choose one to proceed with. There’s three main ways of choosing the correct bid as an owner:
- Low-bid selection
- Qualifications-based bid selection
- Best-value bid selection
As the name suggests, the low-bid selection suggests choosing the lowest possible price for the project’s completion, while the qualifications-based selection puts primary focus on the capabilities of the contractors (the assessment of their capabilities is done through requests for qualifications, or RFQ) and chooses the one with the best capabilities available. The last selection type (the best-value selection) is the combination of the first two, looking for the best combination between the project’s cost and the contractor’s capabilities.
The last part of the bidding process comes after an owner has chosen a contractor and now they are negotiating a payment agreement. There’s four main payment models that are commonly used in the industry:
- Guaranteed maximum price. This contract sets up a specific price that the combination of the total cost and the contractor’s fee can not exceed.
- Cost-plus-fee. A model that combines the total project cost with a fixed percentage on top of it that goes to the contractor; since the owner is covering all of the possible additional costs, this payment model is widely regarded as the most contractor-friendly one.
- Unit price. If there’s no way to agree on a specific cost ahead of time, both parties are going for a unit-price model, which implies that the owner pays a specific unit price for each completed phase of the project.
- Lump sum. In this case, there’s a fixed total amount that both sides agree upon, and the owner pays the entirety of the agreed sum, ignoring any changes that might’ve happened in the process, from the final bill being higher than the initial one to the project not being successful in the first place.
Obstacles for construction management as a process
It should be obvious by now that planning and scheduling in the construction environment is complicated, to say the least. The system in general has too many people and other moving parts, it’s almost guaranteed that you’re going to face one or the several of the following problems that might arise in the construction project management environment:
- Data mismanagement. The lack of a unified data sharing platform spawns a surprising amount of problems, such as data inaccuracies, the lack of simple info sharing capabilities for stakeholders, or just the additional time it takes for the construction team members to locate the necessary project plan updates, material cut sheets or revised drawings, taking away as much as 5+ hours of work time per week.
- Communication problems. This is one more example of a seemingly easy problem causing a wide variety of issues, such as budget overruns for a lot of projects (this costs time and money), this is why the communication skills are of the utmost importance for any leadership figure, especially in the construction project management.
- Unclear milestones. The lack of clear milestones, especially the project finish milestone, often leads to a variety of different problems down the line, mostly appearing as the scope creep.
- Stakeholder collaboration problems. When it comes to reworks, it’s important for the entire rework management process to have all of the stakeholders involved to reduce the amount of potential problems and to increase the overall efficiency.
- Safety standards violation. Surprisingly enough, safety throughout the construction process is still an issue, and the cause of those kinds of problems a lot of times is the lack of attention to safety matters in the first place.
- Refusal or inability to work with the newer technologies in the industry.
- Organizational problems. This topic includes a lot of different issues that could’ve been perfectly avoided but ended up causing problems down the line; some of the most common ones are the project data misplacement, the lack of mistake-handling procedures and general absence of conflict management measures of sorts.
- Problems with budgets. Going over the project’s budget might just be the most popular issue for a lot of projects nowadays; this is the direct responsibility of a project manager, since the research must be done, the prices must be calculated, and the client should have an honest assessment of what can be achieved with their current budget.
- Insufficient employee education. With the recent growth of the employment in the construction industry, it’s always important to thoroughly check the credentials and skills of each of the project members. An unexpected project setback is the least of potential problems that the absence of a proper worker education might cause.
Construction projects and their business models
While the bidding process is usually consistent for the majority of projects, there are two completely different business models that are utilized in the construction industry:
- Design-bid-build contract. A prevalent business model in which the owner can choose their contractor when they already have a complete project design ready – meaning that the design phase was completed beforehand, by either an engineer or an architect.
- Design-build contract. In this case, all of the project’s stages are performed by the same contractor, including the design phase and all of the different construction steps. This approach can technically lessen the time it takes for the project to be completed, since both the design and the construction can be done simultaneously.
Both of the business models above are noting the design phase as the first stage of the bidding process. It is possible to split the design phase in two somewhat different approaches – schematic and programming. Both of them are representing raw drawings/sketches, and the digital models of the project, respectively.
The process of project management and the main principles
The construction as a process can be started right after the bidding process ends, with the stages of a construction project being somewhat similar to the traditional project management. The Project Management Institute has developed a unified five-step plan of a regular construction project that most of the construction project managers are already familiar with and follow in most cases:
- Initiation.
A business case needs to be developed and evaluated as the beginning phase of the construction project, to see if the project is feasible in the first place. To get a defined answer on that question, stakeholders may be asked to perform feasibility testing if they deem it necessary, and all of the parties involved must agree to proceed with the project for the project itself to actually be constructed in the first place. Another significant part of the first phase that is done after the feasibility testing is the project initiation document (PID) that includes the business case and the list of business needs.
- Planning.
The next part of the process is the roadmap development phase for all of the parties involved. The main document of this stage is the project management plan – a formal document created by the project manager to set baselines for costs and scope, to set up a schedule and to guide execution and control. Other documents that are created on this stage of the process are presented below:
- Communication plan
- Risk management plan
- Scope statement/scope documentation
- Work breakdown structure
- Execution.
The large part of the actual construction work is performed within the borders of this stage, typically after a kickoff meeting. After that the project team needs to constantly assign resources, implement project management plans, complete tasks, set up tracking systems, update the schedule, and so on.
- Monitoring.
It’s not uncommon for the monitoring to happen alongside the execution stage, and it is crucial to measure progress and performance, ensuring that everything proceeds according to the plan.
- Closure.
The last stage of the process signifies its completion, often complemented with a post-mortem meeting to discuss what parts of the project met the requirements and which ones didn’t. The last part of this is for the project team to create a list of any remaining tasks, to perform a final budget and to prepare a project/status report.
Different stages of a construction project
While the construction management technically begins with the bidding process, the main part of it starts a bit later, as soon as the contract has been finalized. Generally speaking, the construction project can be separated into 7 different stages:
- Design.
This stage is mostly performed by an architect or an engineer, starting off with the feasibility assessment based on various different parameters of the project, such as the number of rooms, the building size, the amount of space required, and so on. The next step after the feasibility assessment is the schematic/sketch generation, as well as performing research about the equipment type that’s needed, the different materials needed, etc. After the design process is complete, it acts as a signal for a bidding procedure to begin.
- Pre-construction.
The contractor that successfully wins the bidding process is then supposed to be working together with the company’s project team. Some of the participants of the project team are: a project manager, a superintendent, a field engineer, and more. This combined team is then tasked with preparing the construction site for the actual building process, including the examination of the site to know about and/or prevent any unexpected situations connected with the surrounding environment.
There is also a second team that gets created at this same stage, which is the so-called “worker base,” which usually includes people that are actually going to participate in the construction process. Some of the more common participants of this team are:
- Construction workers – the most basic team of people doing most of the actual work, such as pouring concrete, hammering nails, and operating all kinds of construction-related machinery.
- Construction foreman – the person in charge of the construction workers’ team, with responsibilities such as time management (per each construction worker), task completion tracking, as well as construction worker payroll and general project overseeing duty.
- Electrician – setting up all kinds of electricity-related connections within the project is up to this particular person.
- Safety manager – this person’s main job is to ensure that all of the safety standards on site are followed. Reporting any incidents or unusual events on the construction site also falls under this person’s jurisdiction.
- Job supervisor – the task of acting as an intermediary between the construction team and the project management is up to this person to make sure that all of the necessary details are communicated between the teams and the necessary level of supervision over the project’s completion is achieved.
- Construction expeditor – A person in charge of material management, especially regarding material flow to the project from different suppliers. Tasks such as determining which materials are needed in what amount, ordering the materials in question, and performing quality control is usually the duty of a construction expeditor. It is a large part of the next step, procurement.
- Procurement.
At the procurement stage, the team buys everything that’ll be needed for the construction project. This stage might easily turn out to be the shortest one in the list, or it can be a huge problem for all of the parties involved, causing setbacks, arguments and other problems – the project’s size is the deciding factor in this case, as well as the size of the company that was hired to do this project in the first place. It’s not uncommon for big players in the construction market to form dedicated parts of the company solely focused on the material procurement, buying materials in large quantities when working on multiple projects at once. At the same time, smaller projects would have it easier finding limited quantities of materials from local suppliers or hiring local labourers, greatly reducing the overall complexity of this step.
- Construction.
The construction phase starts off with the superintendent arranging a meeting with subcontractors and material suppliers to set the rules for the collaborative work. The preparation part comes next, performing tasks like setting up a temporary storage facility, creating material handling plans, establishing safety programs, etc. As the name suggests, the preparation part is usually followed by the beginning of an actual construction.
- Commissioning.
The commissioning part starts off as soon as the construction is complete, and consists of two main parts: equipment and systems’ testing to be completely sure that everything is operating correctly before turning over the results of the construction to the owner, and the training of the owner’s facility staff to be able to properly operate different systems and perform maintenance when needed.
- Occupancy.
This step encompasses the entirety of the warranty period, and it begins as soon as the owner starts using the constructed building for their own purposes. The warranty period ensures that all of the materials, equipment and the overall building quality meets the expectations specified in the contract. There are two general warranty types: implied warranty – the one required or established by law, and the express warranty – the one that’s included as a part of the contract.
- Project closeout.
Tying up all of the loose ends is what this last stage is all about. The team should formally complete all of the remaining contractual obligations to consider the project finished. Post-project review is sometimes performed as the aftermath of the entire job, and the project completion report is often required for the future reference, at the very least.
Scheduling and organizing a construction project
The complexity of construction projects makes it so that it’s often crucial for all of the participants of the project to stay on schedule so that there’s no problems down the line.
Speaking of organization strategies, there are several different parts of the project that need proper management and organization in any construction project, such as:
- Contract management – setting expectations and procedures around the person of authority, monitoring and reporting methods, how contracts are modified, which financial audits are needed, etc.
- Records management – storage, retrieval and distribution of project records in a safe and secure manner.
- Process of project control – the scope of the project, its schedule and costs are all managed and tracked in this part.
- Planning of contract procurement – procurement document standardization, setting up the expected contract price, estimating the amount of work for specific contracts, etc.
- Drawings – the changes that’s been made throughout the construction process are reflected in the specific drawings that the contractor is supposed to submit when the project is almost finished.
- Project requirement definition – the details of project deliverables.
- Daily documentation – diaries, logs and daily reports are kept as a reference guides after the work is done for any potential problems in the future
- Commissioning – includes a number of different tasks that are all representing the initial idea of the project being followed as planned, including issue resolving, help with coordination and more.
While organization helps you with prioritizing and organizing the important project info, it’s also much easier to create a comprehensive project schedule when all of your organization documents are in one place. There are several different scheduling techniques out there, and the difference between them is quite noticeable:
- Q scheduling: Three of the main pillars of this technique are the total project cost, the specific relationships between various tasks and the order that those tasks are performed in. This technique is the closest to reality but requires a specific software to perform and takes much more effort to evaluate everything for this schedule to prove advantageous.
- Critical path scheduling: might be the most popular scheduling technique, calculating the lowest possible amount of time required for the project to be completed, and the start/end dates for all of the project tasks. This plan makes it obvious that every delay of a specific operation would result in a delay for the entire project.
- Gantt charts: one of the most user-friendly methods of planning a project’s schedule, with project timeline visualisation in the form of horizontal charts that look like a number of cascading bars. It can work with task names, dates, durations, end dates, and so on.
- Line of balance: road construction is the most common client of this technique, since this one is the most suitable for repetitive work. The idea behind it is that all of the different facts about the project are collected at different time intervals and then compared to the expected project’s plan. A resource allocation is also required for each step to prevent unneeded delays.
Issues, problems and other legal matters in the context of a construction project
A specific level of uncertainty is not uncommon for the construction projects in general, but it also creates conflicts in project teams. Construction project managers are supposed to resolve those conflicts, or other disputes, as well as performing risk identification and risk mitigation tasks.
First of all, resolving disputes. Conflicts are often expected to happen sooner or later, and one person that would be the most likely to have to resolve the issue is the project manager. Some of the most common starting points for conflicts are conflicts of interests, resource limitations, lack of clarity, poor communications or power struggles. Most of the time each conflict requires a unique approach, but there are also some known resolution strategies that might help in specific cases, such as:
- Arbitration. The most expensive option out of the three, requires each party to be represented by the attorney, with witnesses and evidence being presented. The arbitrator’s final decision is considered a binding agreement and supposed to end the conflict at its core.
- Mediation. A simple case of a third party being hired to resolve the dispute, it is considered the cheapest solution and the least time-consuming one.
- Mini-trial. A mini-trial is performed in a specific setting and includes a paid attorney or an advisor as participants of the trial. The agreement at the end of the trial is not binding and can still be broken.
Second of all, risk management. Risk management plans are often created to attempt to manage all of the project’s risks, as well as defining the roles of the staff in the risk management department, identifying the potential risks and categorizing them in terms of the potential impact and the likelihood of a specific risk happening in the first place.
A third part of the requirements expected of the project manager is the understanding of legal principles. Construction management can encounter several different areas of liability in the process of working on a specific project. Some examples of potential claims for failing to see the parts of the process that produce defective results are:
- Higher-than-estimate bid
- Overhead extensions
- Project delays
Unfortunately, a lot of the professional liability policies do nothing when it comes to covering some aspect of a faulty workmanship (be it fabrication or installation) or some economic risks, so it’s up to the project manager to make sure that there’s an appropriate coverage and that everyone is doing everything they can to avoid any claims or liabilities.
Environmental/neighborhood impacts of a construction process
While it is possible for construction project managers to plan for licensing, permits and local regulations, it’s also important to remember that nature might also be a part of the construction process, affecting your plans in many different ways. There’s a relatively large number of potential factors that might impact your construction process, such as:
- Vegetation. Some trees and/or vegetation on a construction site could easily be the subject to environmental safeguards, and would have to get a designated safe zone for the growth.
- Storm water pollution. The waste control is important since it’s possible that some of the leftovers from the construction could be carried to the nearby water sources by the storm water with ease.
- Wetlands. In the United States, wetlands are considered some of the most heavily protected areas, and contractors must be extremely vigilant to prevent contaminants and leftovers from the construction from entering the restricted wetlands area.
- Dust/mud. Since the construction process in general creates a lot of dust, the accumulation of said dust could easily disrupt the nearby homes or businesses. An easy way to prevent that is to drive a water truck to a site and spray water all over the place – but this generates mud, which should be cleaned off and/or moved before it can spread out to surrounding areas via construction vehicles.
- Endangered species. As soon as an endangered species is found on site, it is a requirement to immediately cease all of the operations and wait for the authorities to assess the situation. After that, the contractor should comply with a decision from above as to prevent the endangerment of that species.
- Cultural/Historical artifacts. A similar procedure applies to any objects found on site that might be considered artifacts – such as arrowheads, early tools, bones, etc. A construction process must be immediately halted until the artifact is studied and removed.
Construction project management as a job
Construction project management as a job is a good choice for someone who likes building and design but doesn’t like too much of the actual drawing in the process. It’s not uncommon for construction project managers to be paid well, but the amount of work is also significant. Here’s the bare minimum of skills that is usually required from anyone attempting to get a construction project management post:
- Problem solving
- Time management
- Document management
- Leadership
- Understanding of the building processes
- Project coordination and overseeing capabilities
- Extensive communication skills
- Knowledge in the field of the construction scheduling software, as well as the general computer skills.
Speaking of software, there are also many different applications and software platforms that can help make construction project management easier. It can be all about managing a single aspect of the job or managing the entire project creation process from start to finish.
Some of the biggest fields of work for construction project management software are collaboration/communication, better management efficiency, and easier document management within the project.
For example, CoConstruct is a great solution for tracking and coordinating work between different parties in the construction project; it makes it easier to form project budgets, synchronize and update schedules, share all kinds of documents, and more.
A great alternative to that is Procore – a multifaceted solution for streamlined communication within the project. It offers real-time editing of project information and easy documentation access for all parties involved. It can also perform reporting tasks, formulate and synchronize schedules, create project dashboards, and so on.
You can find many more examples of construction project management software and a more detailed explanation of the aforementioned examples in our article about the best construction collaboration & project management software tools.
The construction project management is capable of offering a number of different roles, with most of them requiring a more specific technical background. Some examples of such job titles are listed below:
- Project engineer – a liaison between the project manager and the technicians
- Project manager – general supervisor with planning capabilities
- Field engineer – in-person surveyor of the construction process, the “survey party”
- District construction engineer – technical services department management
- Construction manager – often called the site manager, mostly responsible for running and the maintenance of the construction site
- Operations manager – strategy development and resource allocation (mostly in large companies with many projects in the works at once)
- Project coordinator – the assistant of project manager, acting as a liaison, keeping records, tracking budgets and so on
There’s a lot more technical roles included in the construction project management department, such as the design engineer, project architect, planning engineer, and more. At the same time there’s no shortage of soft-skilled roles that are also needed for the entire system to work, including schedulers, project planners, design managers, and many more than that.
Education in the field of construction project management
Since it is fairly common for project managers to manage entire construction projects from start to finish, it is fair to say that it is a job that pays well but can also be extremely difficult and time-consuming. A newly hired project manager’s average salary starts at around £25,000, while senior project managers usually earn around £60,000. The exact salary depends on several factors, from the location of the company to the complexity of the job in question.
However, getting this kind of job is not easy since there are relatively high educational standards applied to construction project managers worldwide. Most project managers take a degree in either project management, IT, construction management, or business. There is also an avenue in the industry called apprenticeship, even though it is far harder to acquire when compared with regular education.
At the same time, an apprenticeship provides both work experience and education – both of which are essential to secure a job as a construction project manager in the first place. Work experience is something that all university degree holders would have to have to get this job – and that part is already covered when it comes to apprenticeships.
There are many different courses available both offline and online on the topic of construction project management. Coursera’s “Construction Management Specialization” at Columbia University is one such example, offering a series of online courses on different parts of construction management with an approximate completion time of 7 months.
That’s not to say that your education should stop as soon as you get the job. Keeping up with the industry’s trends and adding to your knowledge is essential for any specialist, and construction project management is no exception. This is why there is no shortage of all kinds of educational materials on the topic of construction project management and its specifics.
Here are a few examples of books on the topic of construction management:
This book might as well be considered a detailed guide on managing construction projects, with step-by-step information on what to do and how to avoid expensive mistakes. Some of the topics discussed in the book include contracts, quality, finances, people, safety, scheduling, subcontractors, and more.
Project management is an incredibly sophisticated topic, and the way it is intertwined with construction as a process makes it extremely easy to miss a lot of important nuances. As such, this book tries to cover as many different aspects of construction project management as possible, offering all kinds of insights and advice regarding how the entire process works.
This book covers many different aspects of construction management as a whole and should be useful to newcomers and professionals in the field. It goes through every part of the construction project, from the very first design stage to the post-construction maintenance, while also discussing the overall environmental issues of the industry.
Sustainability in the construction industry
“Green building” or “Green construction” is all about focusing on making the structures to be more eco-friendly and energy-efficient, and it is a significant area of growth in the construction industry as a whole. Environmental responsibility is the main focus of this effort, and it applies to both the building process and the actual building itself.
This is especially important for the project manager since most of the sustainability-related operations have to be initiated by him or her in the first place. This includes environmental issues and environmental compliance in the area of the project, understanding of how the project affects the environment, ensuring the proper disposability of a waste, finding “greener” materials, and so on. It’s also not uncommon for the “green” project managers to be required to have working knowledge about LEED (Leadership in Energy and Environmental Design) and its documentation requirements.