Mega projects

Coordinate, protect, and control high-stakes mega projects

From billion-dollar hospitals to power plants and factories, Revizto unites stakeholders, secures sensitive data, and accelerates delivery of the world’s most complex projects.

Coordinate, protect, and control high-stakes mega projects

Why AECO teams choose Revizto to deliver mega projects

Less complexity
Less complexity

Revizto simplifies highly complex builds, integrating specialized systems and workflows into one intuitive, collaborative platform.

Speed meets scale
Speed meets scale

Experience instant uploads, fluid navigation, and stable performance, even with massive, multi-phase project models that push other platforms to their limits.

Enterprise-grade security
Enterprise-grade security

Revizto protects sensitive projects with strict access controls, secure communication, and auditable collaboration environments.

Designed for the most complex AECO projects

From billion-dollar hospitals to manufacturing facilities and power plants. Precision starts with Revizto.

Powering Australia’s clean energy future with Snowy 2.0

About this project
how revizto helped

Snowy 2.0 is a pumped-hydro power plant linking the Tantangara and Talbingo dams through 27 kilometers of tunnels. One of the most complex and challenging engineering feats in the world, the 2,200 megawatt project will store excess renewable energy and supply clean power to over three million homes, securing Australia’s sustainable energy future.

Revizto enabled real-time collaboration across vast, complex terrain—integrating 3D models, LiDAR scans, and geological data for safer, faster, and more coordinated project delivery.

Read the story
Read the story

Safer, smarter tunneling

Real-time visualization of tunnel conditions increased safety, accuracy, and reduced costly geological surprises.

Effortless model management

Revizto has integrated over 400 design models, 2,700 LiDAR scans, and 27km of geological data—enabling instant navigation and alignment.

Connected global teams

750+ users across seven coordinate systems collaborated securely, maintaining data security and synchronized progress worldwide.

“Revizto’s ability to seamlessly host an outrageous amount of data and models continues to blow me away. It has streamlined collaboration across the whole project, providing a single source of truth for hundreds of team members based in different locations around the world.”
Kevin Golding
Kevin Golding
Digital Engineering Coordinator

Breaking down silos to build Switzerland’s flagship hospital

About this project
how revizto helped

The new Aarau Cantonal Hospital is a landmark in Swiss healthcare, combining cutting-edge technology with patient-centered design. Implenia Switzerland AG, the nation’s leading construction and real estate services provider, faced three key challenges: managing all project phases in one environment, integrating diverse participants, and structuring workloads efficiently across this large-scale, complex build.

Revizto unified planning, coordination, and communication across teams—breaking down silos, streamlining reviews, and enabling seamless collaboration from design to digital twin handover.

Read the story
Read the story
Icon fast

Fast Coordination

Centralized collaboration cut meeting times and simplified planning, allowing faster, more informed decisions across all project phases.

Icon quality control

Automated Quality Control

Revizto’s automated clash detection and data validation tools streamlined model cleanup, reducing coordination errors before construction.

“The ease of use of Revizto makes it possible to introduce all parties involved in a project to the BIM method and thus create a common understanding of the building.”
Patric Sommer
Patric Sommer
Senior BIM Manger