All blog posts

How a tight deadline unlocked "Design Fixity" | DPR Construction & HGA Architects Keynote at Made Right 2026

Table of Contents

Are you prepared for what’s next in AECO?

Read the 2026 report
Read the 2026 report

When DPR Construction and HGA Architects were asked to compress an already aggressive design timeline by 50% on Sutter Health's $800M Silicon Valley campus expansion, the result was chaos — walls moving mid-coordination, detailers working blind, and critical decisions buried in emails. VDC Manager Praseedha and Medical Planner Isvet share how they solved it by building a live design fixity workflow inside Revizto: a room-by-room, colour-coded dashboard that gave every stakeholder — from trade detailers to the owner — real-time visibility into exactly what was locked, what was in flux, and why. The result: no blame game, less rework, and a building now open to the public in Silicon Valley.