For BIM/VDC Managers

You set the standard. Hold every team to it.

Federation, clash detection, and issue tracking in one hub

Sits within the tools and workflows your teams already run

No rip-and-replace

Make your design intent a reality
The problem

You found the clash.
Now it’s lost in someone’s email.

Overhead

15–20 hours lost
Wasted every week per project on manual model management, tedious clash grouping, and generating reports.

Chaos

1,200+ versions circulating
Complete lack of control with thousands of documents flying around simultaneously on a single 200-sheet project.

Delays

6–10 sluggish cycles
Thousands of clashes dragging out over weeks of coordination loops, stalling the project before construction can even start.
Watch now
Watch now
The solution

One universal model. Shared across disciplines. Zero rip-and-replace.

Unified 2D/3D Environment

Unified 2D/3D Environment

2D drawings and 3D models in one interactive workspace. Experience full project context and collaboration.

  • 2D/3D Overlay
  • Splitview
  • Advanced Search
  • AR, VR, and QR Codes
  • Appearance Profiler
Integrated Issue Management

Integrated Issue Management

Create, track, and manage issues in 2D or 3D. From any device. Synced to its exact spatial location.

  • 2D/3D Markups
  • Location Data
  • Stamp & Issue Workflows
  • Issue Automations
Collaborative Clash Automation

Collaborative Clash Automation

The new standard in clash detection. Flexibility, control, and the power to automate.

  • Multiple Clash Types
  • Dynamic Groupings
  • Interactive Visual Analysis
  • Advanced Automations
The benefits

When coordination works,
the impact is real

Time

Hours back
Automate federation and clash. Spend the saved hours on work only you can do.

Influence

ROI you can show
Walk into the next design review with numbers: clashes resolved, schedule held, rework avoided.

Adoption

Integration that stays
Field teams pick it up in minutes. The platform earns its seat.
Title

Title

Title

Title

"We estimate that we’re saving a minimum of 10% on every job in the way of schedule, cost and labor savings. Revizto has had a huge, streamlined effect on our workflows. We firmly believe that for us to touch a job, we can automatically put 10% back into our customer’s budget because of our BIM workflow."

Chris Donahue
Chris Donahue
Director of VDC BIM Services

"The ease of use of Revizto makes it possible to introduce all parties involved in a project to the BIM method and thus create a common understanding of the building."

Patric Sommer
Patric Sommer
Senior BIM Manager

"We had stakeholders initiating virtual reality design reviews because they saw the value that stepping into the model brought. The model was no longer a dead or non-existent document. It was a living system that we could communicate with and collaborate on."

Steve Cline
Steve Cline
VDC & Digital Delivery Technical Lead, Mars

"Advanced automation was really cool because I was able to understand what the detailers care about."

Laura Medina Rodriguez
Laura Medina Rodriguez
VDC Lead, HerreroBoldtWebcar
See it in action

See it on your stack,
not on a slide deck.

Bring a federated model and your worst clash list. We'll show you how Revizto handles it.